Skip to content
home page

Ensuites

Ensuites: new ones built in, tired ones replaced

An ensuite is either a room that exists and needs replacing, which is most new-build and 1990s ensuites once they pass fifteen years, or a room that does not exist yet and has to be carved out of a bedroom, a landing cupboard or a box room. We do both. A replacement takes three to five working days and usually means a better shower, a wall-hung basin with storage and tiles that go further up the wall than the builder's did. A new ensuite needs a stud wall, a door, a route for the soil pipe to the stack, ventilation and a bit of planning so the bedroom still works. We build ensuites across Wrexham, Chester, Flintshire, Denbighshire, Cheshire, the Wirral and north Shropshire.

Or fill in the free quote form

A compact ensuite with a shower enclosure and a wall-hung basin
Experience
More than 50 bathrooms completed
One team
Survey, plumbing, tiling, fitting and finish by the same people
Quotes
Free survey and an itemised written quote, no obligation
Insured
Public liability insurance up to £10 million
Guarantee
A one-year guarantee on our workmanship
Covering
North Wales, Chester, Cheshire, Shropshire, Liverpool and Manchester

What is included

Everything the job needs, listed

Typical time
Three to five working days for a replacement; six to eight for a new room
Quote
Free survey, itemised and in writing
  • Replacement of existing ensuites, same footprint
  • New ensuites built within a bedroom or from a cupboard
  • Stud walls, doors, soil and waste routes, ventilation
  • Compact showers, short-projection toilets, slim vanities
  • Full tiling or wall panels, towel rail, mirror, lighting
  • Electrics by a registered electrician, certified

Replacing a developer ensuite

If you live on one of the newer estates around Wrexham, Chester, Buckley or Ellesmere Port, you probably know the ensuite we mean: an 800 by 800 corner enclosure with a bi-fold door that sticks, a pedestal basin, tiles to waist height, and a cistern that has started to run. The room is usually around 1.2 by 2 metres and the layout is fine; the fittings and finishes were the cheapest the developer could buy.

The upgrade that changes it: a 900 by 900 or 1000 by 800 tray with a single fixed panel instead of the door, a wall-hung vanity with a drawer, a wall-hung or back-to-wall toilet, tiles or panels to the ceiling in the shower and a lit mirror. Same plumbing positions, so it is a week's work and not an expensive one.

Building a new ensuite

The question is always where the soil pipe can go. A toilet needs a 110 millimetre soil pipe falling to the external stack, or a route to it through the floor; if the stack is on the far side of the house the room may not be viable where you want it, or may need a macerator, which we would rather avoid. We check this first, at the survey, before anyone gets attached to a layout.

After that it is a straightforward building job: a timber stud wall with sound insulation, a door (sliding or pocket if the bedroom is tight), hot and cold feeds, a waste route, an extractor ducted to outside, a light circuit and a shaver socket, then the fitting-out. The smallest ensuite worth building is around 1.2 by 1.8 metres; below that you are compromising everything.

Ensuite layouts that work in 1.2 by 2 metres

  • Shower across the far end, toilet and basin along one wall, door opposite: the standard, and standard because it works.
  • Shower in the corner by the door, basin under a window, toilet beside it: keeps the window and the daylight.
  • Wet room end with a single screen, toilet and wall-hung basin opposite: the most open small ensuite you can build.
  • Short-projection toilet (around 600 millimetres) and a 400-millimetre-deep vanity leave a walkway you can turn round in.

Ventilation and noise

An ensuite without a good extractor fan ruins a bedroom: condensation on the window, damp towels, the smell of a shower at 7 am. We fit a fan rated for the room, ducted to outside by the shortest route, with a humidity sensor or a timer overrun so it runs after you leave, and a quiet model because it is a metre from your pillow. If the ensuite is internal with no window, the fan is a requirement, not a choice.

Where we work

Ensuite bathrooms across the region

Based in Wrexham. Each town below has its own page with the local detail: the housing, the water, the council and where to see bathrooms nearby.

Questions

Ensuite bathrooms: straight answers

How much does it cost to add an ensuite?

A new ensuite costs more than a replacement because of the stud wall, the door, the drainage route and the electrics, on top of the fitting-out. The single biggest variable is how far the toilet is from the soil stack. We quote after a survey with every stage itemised; our cost guide covers the typical ranges.

Does an ensuite add value?

In a three or four bedroom house without one, an ensuite to the main bedroom is one of the improvements buyers look for, and it usually helps both the price and the speed of a sale. It is less certain in a two-bedroom house where you would be giving up bedroom space.

Can I put an ensuite anywhere in a bedroom?

Not quite anywhere. The toilet needs a soil pipe route to the external stack with enough fall, and the room needs an extractor route to outside. Those two things decide the position more than anything else, and we check them at the survey.

Do you need planning permission for an ensuite?

Planning permission is not normally needed for an ensuite inside an existing house. Building Regulations do apply to new drainage, electrics and ventilation, and the work is done to those standards; we tell you what is notifiable and who notifies.

How long does an ensuite take to fit?

Replacing an existing ensuite in the same positions takes three to five working days. Building a new one, including the stud wall and drainage, eight to twelve. You get the dates in writing before we start.

Next step

Tell us about your bathroom

Send a few photos of the room and a line about what you want changed. You get a free survey, an itemised quote in writing and a start date, and nobody chases you if you decide to wait.

WhatsApp photos 07308 516518Get a free quote

Quotes are free, itemised and in writing. The price you agree is the price you pay unless you change the job.

WhatsAppCallFree quote